Asbestos SWMS Bundle – 10 Editable Templates
Asbestos SWMS Bundle – 10 Editable Templates
$850.00 Original price was: $850.00.$189.00Current price is: $189.00.
Asbestos SWMS templates for licensed asbestos removalists
Ten SWMS templates covering asbestos work from identification and sampling through to Class A and Class B removal, minor drilling and penetration work, asbestos cement pipe, contaminated soil, waste transport, encapsulation and the unexpected find on site. Every template states plainly that licensed removal work needs a separate Asbestos Removal Control Plan prepared by the licensed removalist. The SWMS supports that plan. It does not replace it.
Want to see one first? Download the free Portable Ladders SWMS template.
What is in the Asbestos SWMS Bundle
- SWMS-ASB-001 Asbestos-Containing Material Identification and Sampling
- SWMS-ASB-002 Non-Friable Asbestos Removal — Up to 10 m² (Unlicensed Threshold)
- SWMS-ASB-003 Class B Non-Friable Asbestos Removal
- SWMS-ASB-004 Class A Friable Asbestos Removal
- SWMS-ASB-005 Minor Drilling/Penetration of Asbestos-Containing Materials
- SWMS-ASB-006 Asbestos Cement Pipe Removal
- SWMS-ASB-007 Asbestos-Contaminated Soil Handling and Remediation
- SWMS-ASB-008 Asbestos Waste Transport and Disposal
- SWMS-ASB-009 Asbestos Encapsulation and Sealing
- SWMS-ASB-010 Unexpected Asbestos Find — Emergency Response
Also included: a bundle register in Excel for your own document control, a one-page Template Instructions document and a How-to-Use guide.
What these templates deal with
- Fibre release during removal: wet methods, prohibited tools and controlled removal sequence
- Enclosures, negative pressure and decontamination units for friable work
- Respiratory protection selection, fit testing and the rule that RPE stays on inside the work area
- Air monitoring, clearance inspection and re-occupation
- Waste wrapping, labelling, transport and disposal records
- Stop-work and make-safe steps for an unexpected asbestos find
What every SWMS template contains
- Document control block for your company, client, project, principal contractor, SWMS number and revision
- Work activity description, a site-specific scope of works field and a coverage note that states what the template does and does not cover
- High risk construction work checklist under s/r 291 of the WHS Regulation (r 322 in Victoria)
- Activity table of 12 job steps in sequence, each with hazards, control measures, initial risk level, residual rating and responsibility
- Task-specific PPE, plant and equipment checks, isolation requirements, permits, hazardous substances and SDS, and training and licensing
- Emergency response, environmental controls (dust, noise, waste, spills) and public protection and exclusion zones
- Legislation register listing the Act and Regulation for each State and Territory, with the relevant Codes of Practice and Australian Standards
- Risk matrix, hierarchy of controls, monitoring and review triggers, and worker consultation and sign-on sheets
Written for every State and Territory
The templates cite the model WHS Regulation (ss/rr 291 and 299 to 303), which applies in New South Wales, Queensland, Western Australia, South Australia, Tasmania, the Northern Territory and the ACT. Victoria is covered through notes to the OHS Regulations 2017 (rr 322 and 327) wherever the differences matter. You tick the Act and Regulation for the place where the work is done. Categories pre-selected in this bundle where the work inherently involves them: work likely to involve disturbing asbestos; movement of powered mobile plant. Review every category against your own site and scope.
Licence classes, the unlicensed removal threshold, notification periods, air monitoring and clearance requirements differ between States and Territories. Each template flags these items for you to confirm with your regulator before work starts.
How it works
- Buy the bundle and download the ZIP file. The link appears on screen and in your order email.
- Open the SWMS for your task in Microsoft Word, add your logo and complete the highlighted fields.
- Tick your State or Territory and the high risk construction work categories that apply, then check every job step, hazard and control against your site and your method. Add, change or delete rows as needed.
- Consult the workers doing the job, have them sign on, give a copy to the principal contractor before the high risk construction work starts, and keep the SWMS available on site.
Before you use them
A template is not a SWMS. It becomes one when it describes your company, your site, your plant and the way your crew will do the work, and when the workers have been consulted. The duty to prepare, follow, review and keep the SWMS stays with the person conducting the business or undertaking (in Victoria, the employer). Legislative references were reviewed when Version A/2026 was issued. Check that they are current for your State or Territory before you issue a SWMS.
Licence
One purchase licenses the templates to one business for use on its own projects. You can edit them, add your branding and issue them as often as you need. They may not be resold, shared outside your business or included in another product or service.
Need it written for you? iHSEQ also prepares site-specific SWMS and reviews existing ones. Contact us or use the Site Specific SWMS generator.





