Concreting SWMS Bundle – 13 Editable Templates

Concreting SWMS Bundle – 13 Editable Templates

Original price was: $850.00.Current price is: $189.00.

Add to Wishlist
Add to Wishlist

Concreting SWMS templates for concreters, formworkers, steel fixers and concrete pumping operators

Thirteen SWMS templates covering concreting from formwork to finishing: placement and finishing, boom and line pumping, formwork, steel fixing, cutting, coring and grinding, slab-on-ground, suspended slabs, tilt-up panels, precast erection, repair, decorative finishes, screeding and post-tensioning. Fall risk is pre-selected on the suspended slab template, and the tilt-up and precast category on those two templates.

Want to see one first? Download the free Portable Ladders SWMS template.

What is in the Concreting SWMS Bundle

  1. SWMS-CON-001 Concrete Placement and Finishing
  2. SWMS-CON-002 Concrete Pumping — Boom and Line Pump
  3. SWMS-CON-003 Formwork Erection and Stripping
  4. SWMS-CON-004 Steel Fixing
  5. SWMS-CON-005 Concrete Cutting, Coring and Grinding
  6. SWMS-CON-006 Slab-on-Ground Construction
  7. SWMS-CON-007 Suspended Slab Construction
  8. SWMS-CON-008 Tilt-Up Panel Construction
  9. SWMS-CON-009 Precast Element Erection
  10. SWMS-CON-010 Concrete Repair and Remediation
  11. SWMS-CON-011 Decorative and Exposed Aggregate Finishing
  12. SWMS-CON-012 Screeding and Floor Levelling
  13. SWMS-CON-013 Post-Tensioning

Also included: a bundle register in Excel for your own document control, a one-page Template Instructions document and a How-to-Use guide.

What these templates deal with

  • Concrete pump hazards: hose whip, line blockages and booms near overhead power lines
  • Formwork collapse: engineered design, inspection and pre-pour sign-off
  • Respirable crystalline silica from cutting, coring and grinding
  • Cement burns and dermatitis from wet concrete
  • Tilt-up and precast erection: bracing, lifting inserts and exclusion zones
  • Post-tensioning: stressing exclusion zones and scanning before any cutting or drilling

What every SWMS template contains

  • Document control block for your company, client, project, principal contractor, SWMS number and revision
  • Work activity description, a site-specific scope of works field and a coverage note that states what the template does and does not cover
  • High risk construction work checklist under s/r 291 of the WHS Regulation (r 322 in Victoria)
  • Activity table of 12 job steps in sequence, each with hazards, control measures, initial risk level, residual rating and responsibility
  • Task-specific PPE, plant and equipment checks, isolation requirements, permits, hazardous substances and SDS, and training and licensing
  • Emergency response, environmental controls (dust, noise, waste, spills) and public protection and exclusion zones
  • Legislation register listing the Act and Regulation for each State and Territory, with the relevant Codes of Practice and Australian Standards
  • Risk matrix, hierarchy of controls, monitoring and review triggers, and worker consultation and sign-on sheets

Written for every State and Territory

The templates cite the model WHS Regulation (ss/rr 291 and 299 to 303), which applies in New South Wales, Queensland, Western Australia, South Australia, Tasmania, the Northern Territory and the ACT. Victoria is covered through notes to the OHS Regulations 2017 (rr 322 and 327) wherever the differences matter. You tick the Act and Regulation for the place where the work is done. Categories pre-selected in this bundle where the work inherently involves them: risk of a person falling more than 2 m; tilt-up or precast concrete elements. Review every category against your own site and scope.

Tilt-up, precast, formwork and post-tensioning work depend on engineering documentation. The templates flag where the engineer’s or designer’s documents govern.

How it works

  1. Buy the bundle and download the ZIP file. The link appears on screen and in your order email.
  2. Open the SWMS for your task in Microsoft Word, add your logo and complete the highlighted fields.
  3. Tick your State or Territory and the high risk construction work categories that apply, then check every job step, hazard and control against your site and your method. Add, change or delete rows as needed.
  4. Consult the workers doing the job, have them sign on, give a copy to the principal contractor before the high risk construction work starts, and keep the SWMS available on site.

Before you use them

A template is not a SWMS. It becomes one when it describes your company, your site, your plant and the way your crew will do the work, and when the workers have been consulted. The duty to prepare, follow, review and keep the SWMS stays with the person conducting the business or undertaking (in Victoria, the employer). Legislative references were reviewed when Version A/2026 was issued. Check that they are current for your State or Territory before you issue a SWMS.

Licence

One purchase licenses the templates to one business for use on its own projects. You can edit them, add your branding and issue them as often as you need. They may not be resold, shared outside your business or included in another product or service.

Need it written for you? iHSEQ also prepares site-specific SWMS and reviews existing ones. Contact us or use the Site Specific SWMS generator.