General Construction SWMS Bundle – 12 Editable Templates

General Construction SWMS Bundle – 12 Editable Templates

Original price was: $850.00.Current price is: $189.00.

Add to Wishlist
Add to Wishlist

General Construction SWMS templates for builders

Twelve SWMS templates for the tasks that cut across every trade: site establishment, manual handling, housekeeping and waste, confined space entry, silica dust, noise, UV and heat, night works, public interface and exclusion zones, first response to incidents, general building maintenance and test and tag. It sits alongside any trade bundle in the store.

Want to see one first? Download the free Portable Ladders SWMS template.

What is in the General Construction SWMS Bundle

  1. SWMS-GEN-001 Site Establishment and Setup
  2. SWMS-GEN-002 Manual Handling
  3. SWMS-GEN-003 Housekeeping and Waste Management
  4. SWMS-GEN-004 Confined Space Entry
  5. SWMS-GEN-005 Silica Dust — General Controls
  6. SWMS-GEN-006 Noise Management
  7. SWMS-GEN-007 UV and Heat Exposure Management
  8. SWMS-GEN-008 Night Works and Low-Light Work
  9. SWMS-GEN-009 Public Interface and Exclusion Zones
  10. SWMS-GEN-010 First Response to Incidents and Emergencies
  11. SWMS-GEN-011 General Building Maintenance and Handyman Tasks
  12. SWMS-GEN-012 Test and Tag of Electrical Equipment

Also included: a bundle register in Excel for your own document control, a one-page Template Instructions document and a How-to-Use guide.

What these templates deal with

  • Confined space entry: permit, isolation, atmospheric testing and rescue
  • Silica dust controls that apply across trades
  • Protecting the public: hoardings, exclusion zones and traffic interface
  • Heat, UV and night work
  • First response when something goes wrong, including incident notification

What every SWMS template contains

  • Document control block for your company, client, project, principal contractor, SWMS number and revision
  • Work activity description, a site-specific scope of works field and a coverage note that states what the template does and does not cover
  • High risk construction work checklist under s/r 291 of the WHS Regulation (r 322 in Victoria)
  • Activity table of 12 job steps in sequence, each with hazards, control measures, initial risk level, residual rating and responsibility
  • Task-specific PPE, plant and equipment checks, isolation requirements, permits, hazardous substances and SDS, and training and licensing
  • Emergency response, environmental controls (dust, noise, waste, spills) and public protection and exclusion zones
  • Legislation register listing the Act and Regulation for each State and Territory, with the relevant Codes of Practice and Australian Standards
  • Risk matrix, hierarchy of controls, monitoring and review triggers, and worker consultation and sign-on sheets

Written for every State and Territory

The templates cite the model WHS Regulation (ss/rr 291 and 299 to 303), which applies in New South Wales, Queensland, Western Australia, South Australia, Tasmania, the Northern Territory and the ACT. Victoria is covered through notes to the OHS Regulations 2017 (rr 322 and 327) wherever the differences matter. You tick the Act and Regulation for the place where the work is done. Categories pre-selected in this bundle where the work inherently involves them: work in or near a confined space. Review every category against your own site and scope.

How it works

  1. Buy the bundle and download the ZIP file. The link appears on screen and in your order email.
  2. Open the SWMS for your task in Microsoft Word, add your logo and complete the highlighted fields.
  3. Tick your State or Territory and the high risk construction work categories that apply, then check every job step, hazard and control against your site and your method. Add, change or delete rows as needed.
  4. Consult the workers doing the job, have them sign on, give a copy to the principal contractor before the high risk construction work starts, and keep the SWMS available on site.

Before you use them

A template is not a SWMS. It becomes one when it describes your company, your site, your plant and the way your crew will do the work, and when the workers have been consulted. The duty to prepare, follow, review and keep the SWMS stays with the person conducting the business or undertaking (in Victoria, the employer). Legislative references were reviewed when Version A/2026 was issued. Check that they are current for your State or Territory before you issue a SWMS.

Licence

One purchase licenses the templates to one business for use on its own projects. You can edit them, add your branding and issue them as often as you need. They may not be resold, shared outside your business or included in another product or service.

Need it written for you? iHSEQ also prepares site-specific SWMS and reviews existing ones. Contact us or use the Site Specific SWMS generator.