Landscaping SWMS Bundle – 15 Editable Templates
Landscaping SWMS Bundle – 15 Editable Templates
$850.00 Original price was: $850.00.$189.00Current price is: $189.00.
Landscaping SWMS templates for landscapers, gardeners and grounds maintenance contractors
Fifteen SWMS templates for landscaping: general landscape construction, excavation and site preparation, paving, retaining walls, turf and synthetic turf, irrigation, planting, tree felling and chainsaw use, pruning and hedge trimming, stump grinding, mowing and brushcutting, grounds maintenance, water features and playground equipment. Fall risk is pre-selected on the pruning template.
Want to see one first? Download the free Portable Ladders SWMS template.
What is in the Landscaping SWMS Bundle
- SWMS-LND-001 General Landscape Construction
- SWMS-LND-002 Landscape Excavation and Site Preparation
- SWMS-LND-003 Paving Installation
- SWMS-LND-004 Landscape Retaining Walls
- SWMS-LND-005 Turf Laying and Preparation
- SWMS-LND-006 Synthetic Turf Installation
- SWMS-LND-007 Irrigation System Installation
- SWMS-LND-008 Planting and Garden Establishment
- SWMS-LND-009 Tree Felling and Chainsaw Use
- SWMS-LND-010 Tree Pruning and Hedge Trimming
- SWMS-LND-011 Stump Grinding
- SWMS-LND-012 Mowing and Brushcutting
- SWMS-LND-013 Garden and Grounds Maintenance
- SWMS-LND-014 Water Feature Construction
- SWMS-LND-015 Playground Equipment Installation
Also included: a bundle register in Excel for your own document control, a one-page Template Instructions document and a How-to-Use guide.
What these templates deal with
- Chainsaw kickback and falling timber
- Small plant, attachments and projectiles from mowing and brushcutting
- Underground services during excavation and irrigation work
- Retaining wall height and engineering limits
- UV, heat and manual handling
What every SWMS template contains
- Document control block for your company, client, project, principal contractor, SWMS number and revision
- Work activity description, a site-specific scope of works field and a coverage note that states what the template does and does not cover
- High risk construction work checklist under s/r 291 of the WHS Regulation (r 322 in Victoria)
- Activity table of 12 job steps in sequence, each with hazards, control measures, initial risk level, residual rating and responsibility
- Task-specific PPE, plant and equipment checks, isolation requirements, permits, hazardous substances and SDS, and training and licensing
- Emergency response, environmental controls (dust, noise, waste, spills) and public protection and exclusion zones
- Legislation register listing the Act and Regulation for each State and Territory, with the relevant Codes of Practice and Australian Standards
- Risk matrix, hierarchy of controls, monitoring and review triggers, and worker consultation and sign-on sheets
Written for every State and Territory
The templates cite the model WHS Regulation (ss/rr 291 and 299 to 303), which applies in New South Wales, Queensland, Western Australia, South Australia, Tasmania, the Northern Territory and the ACT. Victoria is covered through notes to the OHS Regulations 2017 (rr 322 and 327) wherever the differences matter. You tick the Act and Regulation for the place where the work is done. Categories pre-selected in this bundle where the work inherently involves them: risk of a person falling more than 2 m. Review every category against your own site and scope.
Tree permits, chainsaw and chemical competencies, retaining wall thresholds and power line clearance rules vary by State and Territory and are flagged in the templates.
How it works
- Buy the bundle and download the ZIP file. The link appears on screen and in your order email.
- Open the SWMS for your task in Microsoft Word, add your logo and complete the highlighted fields.
- Tick your State or Territory and the high risk construction work categories that apply, then check every job step, hazard and control against your site and your method. Add, change or delete rows as needed.
- Consult the workers doing the job, have them sign on, give a copy to the principal contractor before the high risk construction work starts, and keep the SWMS available on site.
Before you use them
A template is not a SWMS. It becomes one when it describes your company, your site, your plant and the way your crew will do the work, and when the workers have been consulted. The duty to prepare, follow, review and keep the SWMS stays with the person conducting the business or undertaking (in Victoria, the employer). Legislative references were reviewed when Version A/2026 was issued. Check that they are current for your State or Territory before you issue a SWMS.
Licence
One purchase licenses the templates to one business for use on its own projects. You can edit them, add your branding and issue them as often as you need. They may not be resold, shared outside your business or included in another product or service.
Need it written for you? iHSEQ also prepares site-specific SWMS and reviews existing ones. Contact us or use the Site Specific SWMS generator.





