Working at Heights SWMS Bundle – 12 Editable Templates

Working at Heights SWMS Bundle – 12 Editable Templates

Original price was: $850.00.Current price is: $189.00.

Add to Wishlist
Add to Wishlist

Working at Heights SWMS templates for any contractor whose crew works at height, and access specialists

Twelve SWMS templates for work at height: general working at heights, boom-type EWPs, scissor lifts, mobile scaffolds, scaffolding erection and dismantling, harness-based fall arrest and work positioning, rope access, anchor points, voids, penetrations and edge protection, work over or near water, the heights rescue plan and portable ladders. The fall-risk category is pre-selected on every template except Portable Ladders, where it depends on the height of the work.

Want to see one first? Download the free Portable Ladders SWMS template (it is one of the 12 in this bundle).

What is in the Working at Heights SWMS Bundle

  1. SWMS-HGT-001 General Working at Heights
  2. SWMS-HGT-002 Boom-Type EWP Operation
  3. SWMS-HGT-003 Scissor Lift Operation
  4. SWMS-HGT-004 Mobile Scaffold Erection and Use
  5. SWMS-HGT-005 Scaffolding Erection, Alteration and Dismantling
  6. SWMS-HGT-006 Harness-Based Fall Arrest and Work Positioning
  7. SWMS-HGT-007 Rope Access Work
  8. SWMS-HGT-008 Anchor Point Installation and Certification
  9. SWMS-HGT-009 Void, Penetration and Edge Protection
  10. SWMS-HGT-010 Working Over or Near Water
  11. SWMS-HGT-011 Heights Rescue Plan Implementation
  12. SSS-LAD-002 Portable Ladders

Also included: a bundle register in Excel for your own document control, a one-page Template Instructions document and a How-to-Use guide.

What these templates deal with

  • Falls from edges, through penetrations and through fragile surfaces
  • Rescue of a suspended worker: the rescue plan is a condition of harness work
  • EWP overturning, crushing and entrapment
  • Dropped objects and exclusion zones below
  • Scaffold collapse, overloading and unauthorised alteration

What every SWMS template contains

  • Document control block for your company, client, project, principal contractor, SWMS number and revision
  • Work activity description, a site-specific scope of works field and a coverage note that states what the template does and does not cover
  • High risk construction work checklist under s/r 291 of the WHS Regulation (r 322 in Victoria)
  • Activity table of 12 job steps in sequence, each with hazards, control measures, initial risk level, residual rating and responsibility
  • Task-specific PPE, plant and equipment checks, isolation requirements, permits, hazardous substances and SDS, and training and licensing
  • Emergency response, environmental controls (dust, noise, waste, spills) and public protection and exclusion zones
  • Legislation register listing the Act and Regulation for each State and Territory, with the relevant Codes of Practice and Australian Standards
  • Risk matrix, hierarchy of controls, monitoring and review triggers, and worker consultation and sign-on sheets

Written for every State and Territory

The templates cite the model WHS Regulation (ss/rr 291 and 299 to 303), which applies in New South Wales, Queensland, Western Australia, South Australia, Tasmania, the Northern Territory and the ACT. Victoria is covered through notes to the OHS Regulations 2017 (rr 322 and 327) wherever the differences matter. You tick the Act and Regulation for the place where the work is done. Categories pre-selected in this bundle where the work inherently involves them: risk of a person falling more than 2 m; work in or near water or other liquid that involves a risk of drowning. Review every category against your own site and scope.

Scaffolding and EWP high risk work licence classes, overhead line approach distances and work over water approvals are flagged for you to confirm.

How it works

  1. Buy the bundle and download the ZIP file. The link appears on screen and in your order email.
  2. Open the SWMS for your task in Microsoft Word, add your logo and complete the highlighted fields.
  3. Tick your State or Territory and the high risk construction work categories that apply, then check every job step, hazard and control against your site and your method. Add, change or delete rows as needed.
  4. Consult the workers doing the job, have them sign on, give a copy to the principal contractor before the high risk construction work starts, and keep the SWMS available on site.

Before you use them

A template is not a SWMS. It becomes one when it describes your company, your site, your plant and the way your crew will do the work, and when the workers have been consulted. The duty to prepare, follow, review and keep the SWMS stays with the person conducting the business or undertaking (in Victoria, the employer). Legislative references were reviewed when Version A/2026 was issued. Check that they are current for your State or Territory before you issue a SWMS.

Licence

One purchase licenses the templates to one business for use on its own projects. You can edit them, add your branding and issue them as often as you need. They may not be resold, shared outside your business or included in another product or service.

Need it written for you? iHSEQ also prepares site-specific SWMS and reviews existing ones. Contact us or use the Site Specific SWMS generator.