Carpentry & Joinery SWMS Bundle – 11 Editable Templates
Carpentry & Joinery SWMS Bundle – 11 Editable Templates
$850.00 Original price was: $850.00.$189.00Current price is: $189.00.
Carpentry & Joinery SWMS templates for carpenters, framers, joiners and residential builders
Eleven SWMS templates covering carpentry from frame to fix-out: wall and floor framing, roof truss erection, first and second fix, doors and windows, decks, pergolas, stairs, cabinetry and joinery, external cladding and temporary propping. Fall risk is pre-selected on the truss and cladding templates, and temporary load-bearing support is pre-selected on the propping template.
Want to see one first? Download the free Portable Ladders SWMS template.
What is in the Carpentry & Joinery SWMS Bundle
- SWMS-CAR-001 Wall and Floor Framing
- SWMS-CAR-002 Roof Truss Erection
- SWMS-CAR-003 First Fix Carpentry
- SWMS-CAR-004 Second Fix / Fix-Out Carpentry
- SWMS-CAR-005 Door and Window Installation
- SWMS-CAR-006 Timber Decking Construction
- SWMS-CAR-007 Pergolas and Outdoor Structures
- SWMS-CAR-008 Stair Construction and Installation
- SWMS-CAR-009 Cabinetry and Joinery Installation
- SWMS-CAR-010 External Timber Cladding
- SWMS-CAR-011 Temporary Propping and Needle/Shoring Work
Also included: a bundle register in Excel for your own document control, a one-page Template Instructions document and a How-to-Use guide.
What these templates deal with
- Falls during truss erection, upper-storey framing and cladding work
- Nail guns, circular saws and other powered tools
- Frame and truss stability during erection: temporary bracing and sequence
- Manual handling of frames, trusses, sheets and long lengths
- Structural alterations: propping and needling to the engineer’s design
What every SWMS template contains
- Document control block for your company, client, project, principal contractor, SWMS number and revision
- Work activity description, a site-specific scope of works field and a coverage note that states what the template does and does not cover
- High risk construction work checklist under s/r 291 of the WHS Regulation (r 322 in Victoria)
- Activity table of 12 job steps in sequence, each with hazards, control measures, initial risk level, residual rating and responsibility
- Task-specific PPE, plant and equipment checks, isolation requirements, permits, hazardous substances and SDS, and training and licensing
- Emergency response, environmental controls (dust, noise, waste, spills) and public protection and exclusion zones
- Legislation register listing the Act and Regulation for each State and Territory, with the relevant Codes of Practice and Australian Standards
- Risk matrix, hierarchy of controls, monitoring and review triggers, and worker consultation and sign-on sheets
Written for every State and Territory
The templates cite the model WHS Regulation (ss/rr 291 and 299 to 303), which applies in New South Wales, Queensland, Western Australia, South Australia, Tasmania, the Northern Territory and the ACT. Victoria is covered through notes to the OHS Regulations 2017 (rr 322 and 327) wherever the differences matter. You tick the Act and Regulation for the place where the work is done. Categories pre-selected in this bundle where the work inherently involves them: risk of a person falling more than 2 m; temporary load-bearing support for structural alterations or repairs. Review every category against your own site and scope.
Builder and trade licensing or registration requirements vary by State and Territory and are flagged for you to confirm.
How it works
- Buy the bundle and download the ZIP file. The link appears on screen and in your order email.
- Open the SWMS for your task in Microsoft Word, add your logo and complete the highlighted fields.
- Tick your State or Territory and the high risk construction work categories that apply, then check every job step, hazard and control against your site and your method. Add, change or delete rows as needed.
- Consult the workers doing the job, have them sign on, give a copy to the principal contractor before the high risk construction work starts, and keep the SWMS available on site.
Before you use them
A template is not a SWMS. It becomes one when it describes your company, your site, your plant and the way your crew will do the work, and when the workers have been consulted. The duty to prepare, follow, review and keep the SWMS stays with the person conducting the business or undertaking (in Victoria, the employer). Legislative references were reviewed when Version A/2026 was issued. Check that they are current for your State or Territory before you issue a SWMS.
Licence
One purchase licenses the templates to one business for use on its own projects. You can edit them, add your branding and issue them as often as you need. They may not be resold, shared outside your business or included in another product or service.
Need it written for you? iHSEQ also prepares site-specific SWMS and reviews existing ones. Contact us or use the Site Specific SWMS generator.