Steel Construction SWMS Bundle – 8 Editable Templates
Steel Construction SWMS Bundle – 8 Editable Templates
$850.00 Original price was: $850.00.$189.00Current price is: $189.00.
Steel Construction SWMS templates for steel erectors, riggers, fabricators and shed builders
Eight SWMS templates for steel construction: structural steel erection, on-site fabrication and modification, structural welding, metal roof and floor decking, purlins and girts, bolting and torquing at heights, mezzanine floors, and balustrades and handrails. Fall risk and mobile plant are pre-selected where the work inherently involves them.
Want to see one first? Download the free Portable Ladders SWMS template.
What is in the Steel Construction SWMS Bundle
- SWMS-STL-001 Structural Steel Erection
- SWMS-STL-002 On-Site Steel Fabrication and Modification
- SWMS-STL-003 Structural Welding
- SWMS-STL-004 Metal Roof and Floor Decking Installation
- SWMS-STL-005 Purlin and Girt Installation
- SWMS-STL-006 Bolting and Torquing at Heights
- SWMS-STL-007 Mezzanine Floor Installation
- SWMS-STL-008 Balustrade and Handrail Fabrication and Installation
Also included: a bundle register in Excel for your own document control, a one-page Template Instructions document and a How-to-Use guide.
What these templates deal with
- Falls during erection, decking and bolting-up
- Structural instability before the frame is complete: erection sequence and temporary bracing
- Crane lifts and suspended loads
- Dropped tools, bolts and components
- Welding fume, arc flash and fire
What every SWMS template contains
- Document control block for your company, client, project, principal contractor, SWMS number and revision
- Work activity description, a site-specific scope of works field and a coverage note that states what the template does and does not cover
- High risk construction work checklist under s/r 291 of the WHS Regulation (r 322 in Victoria)
- Activity table of 12 job steps in sequence, each with hazards, control measures, initial risk level, residual rating and responsibility
- Task-specific PPE, plant and equipment checks, isolation requirements, permits, hazardous substances and SDS, and training and licensing
- Emergency response, environmental controls (dust, noise, waste, spills) and public protection and exclusion zones
- Legislation register listing the Act and Regulation for each State and Territory, with the relevant Codes of Practice and Australian Standards
- Risk matrix, hierarchy of controls, monitoring and review triggers, and worker consultation and sign-on sheets
Written for every State and Territory
The templates cite the model WHS Regulation (ss/rr 291 and 299 to 303), which applies in New South Wales, Queensland, Western Australia, South Australia, Tasmania, the Northern Territory and the ACT. Victoria is covered through notes to the OHS Regulations 2017 (rr 322 and 327) wherever the differences matter. You tick the Act and Regulation for the place where the work is done. Categories pre-selected in this bundle where the work inherently involves them: risk of a person falling more than 2 m; movement of powered mobile plant. Review every category against your own site and scope.
Erection sequence and temporary stability depend on the engineer’s documentation. The templates flag where it governs, along with rigging and dogging licence classes.
How it works
- Buy the bundle and download the ZIP file. The link appears on screen and in your order email.
- Open the SWMS for your task in Microsoft Word, add your logo and complete the highlighted fields.
- Tick your State or Territory and the high risk construction work categories that apply, then check every job step, hazard and control against your site and your method. Add, change or delete rows as needed.
- Consult the workers doing the job, have them sign on, give a copy to the principal contractor before the high risk construction work starts, and keep the SWMS available on site.
Before you use them
A template is not a SWMS. It becomes one when it describes your company, your site, your plant and the way your crew will do the work, and when the workers have been consulted. The duty to prepare, follow, review and keep the SWMS stays with the person conducting the business or undertaking (in Victoria, the employer). Legislative references were reviewed when Version A/2026 was issued. Check that they are current for your State or Territory before you issue a SWMS.
Licence
One purchase licenses the templates to one business for use on its own projects. You can edit them, add your branding and issue them as often as you need. They may not be resold, shared outside your business or included in another product or service.
Need it written for you? iHSEQ also prepares site-specific SWMS and reviews existing ones. Contact us or use the Site Specific SWMS generator.





