Electrical SWMS Bundle – 14 Editable Templates
Electrical SWMS Bundle – 14 Editable Templates
$850.00 Original price was: $850.00.$189.00Current price is: $189.00.
Electrical SWMS templates for electricians
Fourteen SWMS templates for electrical work: general installation, rough-in, switchboards, energised testing and fault-finding, cable pulling, work near overhead lines, underground cable, temporary site power, data and communications cabling, antennas, appliance repair, emergency and exit lighting, generators and EV chargers. The energised electrical category is pre-selected on thirteen of the fourteen templates.
Want to see one first? Download the free Portable Ladders SWMS template.
What is in the Electrical SWMS Bundle
- SWMS-ELE-001 General Electrical Installation
- SWMS-ELE-002 Electrical Rough-In
- SWMS-ELE-003 Switchboard Installation and Upgrades
- SWMS-ELE-004 Energised Electrical Work — Testing and Fault-Finding Only
- SWMS-ELE-005 Cable Pulling and Terminating
- SWMS-ELE-006 Working Near Overhead Power Lines
- SWMS-ELE-007 Underground Cable Installation
- SWMS-ELE-008 Temporary Site Power and Distribution Boards
- SWMS-ELE-009 Data and Communications Cabling
- SWMS-ELE-010 Antenna and Satellite Dish Installation
- SWMS-ELE-011 Appliance and Equipment Electrical Repair
- SWMS-ELE-012 Emergency and Exit Lighting Installation and Testing
- SWMS-ELE-013 Generator Installation and Operation
- SWMS-ELE-014 EV Charger Installation
Also included: a bundle register in Excel for your own document control, a one-page Template Instructions document and a How-to-Use guide.
What these templates deal with
- Electric shock: isolation, lock-out and test for dead before work
- Energised work limited to testing and fault-finding, with a safety observer and rescue arrangements
- Asbestos backing panels in older switchboards
- Ceiling spaces, roof voids and ladder work
- Underground services and overhead lines
What every SWMS template contains
- Document control block for your company, client, project, principal contractor, SWMS number and revision
- Work activity description, a site-specific scope of works field and a coverage note that states what the template does and does not cover
- High risk construction work checklist under s/r 291 of the WHS Regulation (r 322 in Victoria)
- Activity table of 12 job steps in sequence, each with hazards, control measures, initial risk level, residual rating and responsibility
- Task-specific PPE, plant and equipment checks, isolation requirements, permits, hazardous substances and SDS, and training and licensing
- Emergency response, environmental controls (dust, noise, waste, spills) and public protection and exclusion zones
- Legislation register listing the Act and Regulation for each State and Territory, with the relevant Codes of Practice and Australian Standards
- Risk matrix, hierarchy of controls, monitoring and review triggers, and worker consultation and sign-on sheets
Written for every State and Territory
The templates cite the model WHS Regulation (ss/rr 291 and 299 to 303), which applies in New South Wales, Queensland, Western Australia, South Australia, Tasmania, the Northern Territory and the ACT. Victoria is covered through notes to the OHS Regulations 2017 (rr 322 and 327) wherever the differences matter. You tick the Act and Regulation for the place where the work is done. Categories pre-selected in this bundle where the work inherently involves them: work on or near energised electrical installations or services; risk of a person falling more than 2 m. Review every category against your own site and scope.
Electrical work must be performed by an electrician licensed in the State or Territory where the work is carried out. Queensland also applies its own Electrical Safety Act and Regulation.
How it works
- Buy the bundle and download the ZIP file. The link appears on screen and in your order email.
- Open the SWMS for your task in Microsoft Word, add your logo and complete the highlighted fields.
- Tick your State or Territory and the high risk construction work categories that apply, then check every job step, hazard and control against your site and your method. Add, change or delete rows as needed.
- Consult the workers doing the job, have them sign on, give a copy to the principal contractor before the high risk construction work starts, and keep the SWMS available on site.
Before you use them
A template is not a SWMS. It becomes one when it describes your company, your site, your plant and the way your crew will do the work, and when the workers have been consulted. The duty to prepare, follow, review and keep the SWMS stays with the person conducting the business or undertaking (in Victoria, the employer). Legislative references were reviewed when Version A/2026 was issued. Check that they are current for your State or Territory before you issue a SWMS.
Licence
One purchase licenses the templates to one business for use on its own projects. You can edit them, add your branding and issue them as often as you need. They may not be resold, shared outside your business or included in another product or service.
Need it written for you? iHSEQ also prepares site-specific SWMS and reviews existing ones. Contact us or use the Site Specific SWMS generator.





