Earthmoving & Mobile Plant SWMS Bundle – 14 Editable Templates
Earthmoving & Mobile Plant SWMS Bundle – 14 Editable Templates
$850.00 Original price was: $850.00.$189.00Current price is: $189.00.
Earthmoving & Mobile Plant SWMS templates for earthmoving contractors
Fourteen SWMS templates for mobile plant: excavators, skid steers, backhoes, front-end loaders, graders, rollers, dozers, articulated dump trucks, telehandlers and forklifts, plus float loading and transport, attachments, work near underground and overhead services, and refuelling and field maintenance. The mobile plant category is pre-selected on every template.
Want to see one first? Download the free Portable Ladders SWMS template.
What is in the Earthmoving & Mobile Plant SWMS Bundle
- SWMS-EMP-001 Excavator Operations
- SWMS-EMP-002 Skid Steer Loader Operations
- SWMS-EMP-003 Backhoe Operations
- SWMS-EMP-004 Front-End Loader Operations
- SWMS-EMP-005 Grader Operations
- SWMS-EMP-006 Roller and Compactor Operations
- SWMS-EMP-007 Dozer Operations
- SWMS-EMP-008 Articulated Dump Truck Operations
- SWMS-EMP-009 Telehandler Operations
- SWMS-EMP-010 Forklift Operations
- SWMS-EMP-011 Plant Float Loading, Transport and Unloading
- SWMS-EMP-012 Plant Attachments — Auger, Hammer and Grab
- SWMS-EMP-013 Mobile Plant Work Near Underground and Overhead Services
- SWMS-EMP-014 Plant Refuelling and Field Maintenance
Also included: a bundle register in Excel for your own document control, a one-page Template Instructions document and a How-to-Use guide.
What these templates deal with
- People struck or crushed by plant: exclusion zones, spotters and positive communication
- Rollover: slopes, edges, ROPS and seatbelts
- Service strikes: plans, potholing and overhead line approach distances
- Quick-hitch and attachment failures
- Loading and unloading plant from floats
What every SWMS template contains
- Document control block for your company, client, project, principal contractor, SWMS number and revision
- Work activity description, a site-specific scope of works field and a coverage note that states what the template does and does not cover
- High risk construction work checklist under s/r 291 of the WHS Regulation (r 322 in Victoria)
- Activity table of 12 job steps in sequence, each with hazards, control measures, initial risk level, residual rating and responsibility
- Task-specific PPE, plant and equipment checks, isolation requirements, permits, hazardous substances and SDS, and training and licensing
- Emergency response, environmental controls (dust, noise, waste, spills) and public protection and exclusion zones
- Legislation register listing the Act and Regulation for each State and Territory, with the relevant Codes of Practice and Australian Standards
- Risk matrix, hierarchy of controls, monitoring and review triggers, and worker consultation and sign-on sheets
Written for every State and Territory
The templates cite the model WHS Regulation (ss/rr 291 and 299 to 303), which applies in New South Wales, Queensland, Western Australia, South Australia, Tasmania, the Northern Territory and the ACT. Victoria is covered through notes to the OHS Regulations 2017 (rr 322 and 327) wherever the differences matter. You tick the Act and Regulation for the place where the work is done. Categories pre-selected in this bundle where the work inherently involves them: movement of powered mobile plant; work on or near energised electrical installations or services. Review every category against your own site and scope.
Operator competency arrangements, forklift licensing, telehandler licence thresholds and oversize transport permits vary by State and Territory and are flagged in the templates.
How it works
- Buy the bundle and download the ZIP file. The link appears on screen and in your order email.
- Open the SWMS for your task in Microsoft Word, add your logo and complete the highlighted fields.
- Tick your State or Territory and the high risk construction work categories that apply, then check every job step, hazard and control against your site and your method. Add, change or delete rows as needed.
- Consult the workers doing the job, have them sign on, give a copy to the principal contractor before the high risk construction work starts, and keep the SWMS available on site.
Before you use them
A template is not a SWMS. It becomes one when it describes your company, your site, your plant and the way your crew will do the work, and when the workers have been consulted. The duty to prepare, follow, review and keep the SWMS stays with the person conducting the business or undertaking (in Victoria, the employer). Legislative references were reviewed when Version A/2026 was issued. Check that they are current for your State or Territory before you issue a SWMS.
Licence
One purchase licenses the templates to one business for use on its own projects. You can edit them, add your branding and issue them as often as you need. They may not be resold, shared outside your business or included in another product or service.
Need it written for you? iHSEQ also prepares site-specific SWMS and reviews existing ones. Contact us or use the Site Specific SWMS generator.





