Demolition SWMS Bundle – 10 Editable Templates
Demolition SWMS Bundle – 10 Editable Templates
$850.00 Original price was: $850.00.$189.00Current price is: $189.00.
Demolition SWMS templates for demolition contractors, strip-out crews and builders
Ten SWMS templates for demolition: structural, mechanical and hand demolition, strip-out, concrete cutting and sawing, the pre-demolition hazardous materials survey, temporary shoring and propping, chimney, tank and structure removal, waste segregation and contaminated site work. Demolition of a load-bearing structure is pre-selected where it applies. In Victoria all demolition work is high risk construction work, and the templates say so.
Want to see one first? Download the free Portable Ladders SWMS template.
What is in the Demolition SWMS Bundle
- SWMS-DEM-001 Structural Demolition
- SWMS-DEM-002 Mechanical Demolition
- SWMS-DEM-003 Hand Demolition
- SWMS-DEM-004 Strip-Out Demolition
- SWMS-DEM-005 Concrete Cutting and Sawing for Demolition
- SWMS-DEM-006 Pre-Demolition Hazardous Materials Survey
- SWMS-DEM-007 Temporary Shoring and Propping for Demolition
- SWMS-DEM-008 Chimney, Tank and Structure Removal
- SWMS-DEM-009 Demolition Waste Segregation and Removal
- SWMS-DEM-010 Contaminated Site Demolition
Also included: a bundle register in Excel for your own document control, a one-page Template Instructions document and a How-to-Use guide.
What these templates deal with
- Unplanned collapse: demolition sequence and the engineer’s methodology
- Asbestos, lead and other hazardous materials found before or during the work
- Live services: isolation and proof of disconnection before demolition starts
- Falling debris, dust and public protection around the site
- Excavators and other plant working among people and structures
What every SWMS template contains
- Document control block for your company, client, project, principal contractor, SWMS number and revision
- Work activity description, a site-specific scope of works field and a coverage note that states what the template does and does not cover
- High risk construction work checklist under s/r 291 of the WHS Regulation (r 322 in Victoria)
- Activity table of 12 job steps in sequence, each with hazards, control measures, initial risk level, residual rating and responsibility
- Task-specific PPE, plant and equipment checks, isolation requirements, permits, hazardous substances and SDS, and training and licensing
- Emergency response, environmental controls (dust, noise, waste, spills) and public protection and exclusion zones
- Legislation register listing the Act and Regulation for each State and Territory, with the relevant Codes of Practice and Australian Standards
- Risk matrix, hierarchy of controls, monitoring and review triggers, and worker consultation and sign-on sheets
Written for every State and Territory
The templates cite the model WHS Regulation (ss/rr 291 and 299 to 303), which applies in New South Wales, Queensland, Western Australia, South Australia, Tasmania, the Northern Territory and the ACT. Victoria is covered through notes to the OHS Regulations 2017 (rr 322 and 327) wherever the differences matter. You tick the Act and Regulation for the place where the work is done. Categories pre-selected in this bundle where the work inherently involves them: demolition of a load-bearing structure; movement of powered mobile plant; work likely to involve disturbing asbestos; temporary load-bearing support for structural alterations or repairs; work in an area that may have a contaminated or flammable atmosphere. Review every category against your own site and scope.
Demolition licensing and notification requirements vary by State and Territory. Confirm with your local regulator before work commences.
How it works
- Buy the bundle and download the ZIP file. The link appears on screen and in your order email.
- Open the SWMS for your task in Microsoft Word, add your logo and complete the highlighted fields.
- Tick your State or Territory and the high risk construction work categories that apply, then check every job step, hazard and control against your site and your method. Add, change or delete rows as needed.
- Consult the workers doing the job, have them sign on, give a copy to the principal contractor before the high risk construction work starts, and keep the SWMS available on site.
Before you use them
A template is not a SWMS. It becomes one when it describes your company, your site, your plant and the way your crew will do the work, and when the workers have been consulted. The duty to prepare, follow, review and keep the SWMS stays with the person conducting the business or undertaking (in Victoria, the employer). Legislative references were reviewed when Version A/2026 was issued. Check that they are current for your State or Territory before you issue a SWMS.
Licence
One purchase licenses the templates to one business for use on its own projects. You can edit them, add your branding and issue them as often as you need. They may not be resold, shared outside your business or included in another product or service.
Need it written for you? iHSEQ also prepares site-specific SWMS and reviews existing ones. Contact us or use the Site Specific SWMS generator.





